Telecom sites

Cell towers need power that does not drop, often where the grid is weak or missing.

What a telecom site asks of storage

  • Carry the site through grid outages until power returns or a generator takes over.
  • Handle load swings as radio traffic changes through the day.
  • Cut generator runtime and fuel deliveries at off-grid and weak-grid sites.
  • Keep working in equipment shelters and cabinets that run hot or cold.
  • Connect to the site DC power plant, which often runs at −48 V.

How the hybrid approach helps

The first seconds

The sharpest load steps come when the grid drops and when a generator starts. Supercapacitors are built for exactly that kind of short, high-power duty.

The hours that follow

Sodium-ion batteries carry the site through the outage, so the generator has time to start, or does not need to start at all for short events.

Less generator time

At off-grid and weak-grid sites, stored energy lets the generator run in fewer, fuller-load periods instead of idling, and solar can charge the batteries by day.

Step through an outage

1 / 4

Grid available

The grid powers the site and keeps the batteries and supercapacitors charged, ready for an outage.

We build what is inside the dashed line. The converter, the grid, the generator and your own equipment are already on site.

How energy moves through the system. Every site, including backup operation, is sized for its own load.

What we need to look at a site

  • Average and peak DC load, or an interval load profile
  • Required backup time
  • Outage history for the site
  • Generator size, typical runtime and fuel delivery schedule
  • Solar or wind potential, if any
  • Shelter or cabinet space and temperature range

Talk to us about a telecom project